Buildup of Office at Warehouse 3 - NOON Technopark
Cast in place reinforced concrete to External stair Cast in place reinforced concrete to Stiffiner Column (Toilet). Supply & installation of powder coated steel door with glass. Supply & Fix Porcelain Floor Tiling including laying pattern including epoxy grout ,over cement sand screed overall thickness 50mm and protection after installing as per drawing. Supply and install bronze full gate valve for all bathrooms, toilets and kitchen all in accordance with drawings and specifications.
Project Details
Type of Work: Installation, fabrication and fit-out
Project: Buildup of Office & WC Warehouse 3-Technopark
Location: Plot TP010104E, Technopark, Down-town Jebel Ali, Dubai, UAE
Client: NOON Dubai, UAE
Project Value : 600,000 AED
Completion Proposed: September 2021
Project Gallery
Buildup of Office & WC
Project Completed Picture