Buildup of Office at Warehouse 3 - NOON Technopark

Cast in place reinforced concrete to External stair Cast in place reinforced concrete to Stiffiner Column (Toilet). Supply & installation of powder coated steel door with glass. Supply & Fix Porcelain Floor Tiling including laying pattern including epoxy grout ,over cement sand screed overall thickness 50mm and protection after installing as per drawing. Supply and install bronze full gate valve for all bathrooms, toilets and kitchen all in accordance with drawings and specifications.

WhatsApp Image 2021-09-30 at 3.03.59 PM
Project Details
    •  
      Type of Work:  Installation, fabrication and fit-out
    • Project: Buildup of Office & WC Warehouse 3-Technopark
    • Location: Plot TP010104E, Technopark, Down-town Jebel Ali, Dubai, UAE
    • Client: NOON Dubai, UAE
    • Project Value : 600,000 AED
    • Completion Proposed: September 2021
    •  
Buildup of Office & WC
Project Completed Picture
Scroll to top

This website uses cookies. By continuing to use this site, you accept our use of cookies.